Below is a brief job checklist for our customers; however, we
require that you also read the
Installation Guide which
contains complete information that you need to know prior to
templating and installation.
TEMPLATING Requirements:
1. Customer must be present during templating process.
2. Contract and Installation Guide must be signed prior to templating.
3. Material must be selected prior to templating.
4. Cabinets must be installed prior to templating.
5. Sinks must be on site prior to templating.
INSTALLATION Requirements:
1. If customer chooses to handle their own demolition of old
countertops, it must be completed prior to arrival of installers.
2. Plumbing and electrical should be disconnected prior to arrival
of installers. Customer is aware that installers are not responsible
for disconnecting or reconnecting drains, faucets, and electrical
items.
3. Dishwasher, cooktop/stove and faucets must be on site at time of
installation.
4. Vent hoods and corbels must be installed prior to installation.
5. Customer / Jobsite Coordinator must be present at the beginning
and end of installation for walk-through and sign-off on the job.
6. Due to dust caused from stone installation, other work including
drywall, painting, wallpaper, etc., should be done after
installation of stone.
As mentioned, the above info is only a brief checklist; please be
sure to read the
Installation Guide which
contains complete information that you will need prior to templating and installation. Thank you!